{"id":38,"date":"2024-10-13T19:09:04","date_gmt":"2024-10-13T17:09:04","guid":{"rendered":"https:\/\/llefia.org\/santsalvador\/?p=38"},"modified":"2025-03-21T16:49:23","modified_gmt":"2025-03-21T14:49:23","slug":"38","status":"publish","type":"post","link":"https:\/\/llefia.org\/santsalvador\/2024\/10\/13\/38\/","title":{"rendered":"En quin punt ens trobem?"},"content":{"rendered":"\n<p>El projecte el<strong> <a rel=\"noreferrer noopener\" href=\"https:\/\/llefia.org\/santsalvador\/documentacio-tecnica\/\" data-type=\"page\" data-id=\"8\" target=\"_blank\">dissenya i el paga l&#8217;\u00c0rea Metropolitana de Barcelona(AMB)<\/a><\/strong>, \u00e9s un projecte fruit de la pressi\u00f3 ve\u00efnal des de fa anys davant la degradaci\u00f3 i la inseguretat de l&#8217;espai, no \u00e9s un projecte flor d&#8217;un dia, ni de cap d\u00e1diva de l&#8217;alcalde anterior, ni de l&#8217;actual. A continuaci\u00f3 mostrem fites temporals per entendre on ens trobem, i el &#8220;par\u00f3n&#8221; d&#8217;aquest darrer any:<\/p>\n\n\n\n<p>&#8211;<a href=\"https:\/\/llefia.org\/santsalvador\/documentacio-tecnica\/\" data-type=\"page\" data-id=\"8\" target=\"_blank\" rel=\"noreferrer noopener\">Projecte i pl\u00e0nols<\/a><strong> acabats el<\/strong> <strong>2022<\/strong><\/p>\n\n\n\n<p>&#8211;<a rel=\"noreferrer noopener\" href=\"https:\/\/www.badalona.cat\/ca\/serveis-ajuntament\/projectes-i-obres\/aprovacio-inicial-per-lamb-del-projecte-de-reurbanitzacio-de-lav-sant-salvador-i-c-guasch-al-municipi-de-badalona\" target=\"_blank\">Aprovaci\u00f3 inicial <\/a><strong> <\/strong><strong>juny de 2023<\/strong><\/p>\n\n\n\n<p>&#8211;<strong>Un any aturat sense not\u00edcies per part del govern municipal&#8230;<\/strong><\/p>\n\n\n\n<p><a rel=\"noreferrer noopener\" href=\"https:\/\/contractaciopublica.cat\/ca\/detall-publicacio\/50d6f475-8109-4fba-bd42-2eae58cbacb1\/300261129\" target=\"_blank\">-Anunci de licitaci\u00f3 <\/a><strong>a<\/strong><strong>gost de 2024<\/strong><\/p>\n\n\n\n<p>&#8211;<a rel=\"noreferrer noopener\" href=\"https:\/\/contractaciopublica.cat\/ca\/detall-publicacio\/50d6f475-8109-4fba-bd42-2eae58cbacb1\/300264048\" target=\"_blank\">Anunci avaluaci\u00f3 ofertes<strong> <\/strong><\/a><strong>octubre 2024<\/strong> s&#8217;han presentat 5 empreses.<\/p>\n\n\n\n<p>&#8211;<a rel=\"noreferrer noopener\" href=\"https:\/\/contractaciopublica.cat\/ca\/detall-publicacio\/50d6f475-8109-4fba-bd42-2eae58cbacb1\/300346797\" target=\"_blank\">Adjudicaci\u00f3 del projecte<\/a> <strong>desembre 2024<\/strong>, l&#8217;empresa adjudicat\u00e0ria ha estat: ARN\u00d3 INFRAESTRUCTURAS, SLU <\/p>\n\n\n\n<p>&#8211;<strong>Data d&#8217;inici d&#8217;obres<\/strong> 21\/3\/2025<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Resum documentaci\u00f3<\/strong><\/p>\n\n\n\n<p>&#8211;<a rel=\"noreferrer noopener\" href=\"https:\/\/drive.google.com\/file\/d\/1xSDSP51pbi8djArx5lZSpKi_-OlvhqAy\/view?usp=sharing\" target=\"_blank\">Projecte t\u00e8cnic final<\/a><\/p>\n\n\n\n<p>-Valor estimat: 1.587.397,70 \u20ac, IVA no incl\u00f2s<\/p>\n\n\n\n<p>-Valor adjudicat: <strong>1.370.241,70 \u20ac<\/strong>, <strong>IVA no incl\u00f2s<\/strong> (<strong>1.657.992,46 \u20ac<\/strong> IVA incl\u00f2s)<\/p>\n\n\n\n<p>-Termini: <strong>7 mesos<\/strong> <strong>Fase I i  8 mesos m\u00e9s  Fase II<\/strong><\/p>\n\n\n\n<p>-Data d&#8217;inici obres:  <strong>21\/3\/2025<\/strong><\/p>\n\n\n\n<p><strong>Fase I<\/strong> (C\/Guasch fins a C\/ Aribau)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"1024\" height=\"769\" src=\"https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-2-1024x769.png\" alt=\"\" class=\"wp-image-90\" srcset=\"https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-2-1024x769.png 1024w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-2-300x225.png 300w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-2-768x577.png 768w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-2.png 1190w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Cronograma Fase I<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"1024\" height=\"419\" src=\"http:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/Cronogrma_8_mesos-1024x419.jpg\" alt=\"\" class=\"wp-image-95\" srcset=\"https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/Cronogrma_8_mesos-1024x419.jpg 1024w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/Cronogrma_8_mesos-300x123.jpg 300w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/Cronogrma_8_mesos-768x314.jpg 768w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/Cronogrma_8_mesos.jpg 1362w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Fase II<\/strong> (C\/Guasch fins Carretera Santa Coloma)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"1024\" height=\"532\" src=\"https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-1-1024x532.png\" alt=\"\" class=\"wp-image-89\" srcset=\"https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-1-1024x532.png 1024w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-1-300x156.png 300w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-1-768x399.png 768w, https:\/\/llefia.org\/santsalvador\/wp-content\/uploads\/sites\/32\/2024\/10\/image-1.png 1391w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>El projecte el dissenya i el paga l&#8217;\u00c0rea Metropolitana de Barcelona(AMB), \u00e9s un projecte fruit de la pressi\u00f3 ve\u00efnal des de fa anys davant la degradaci\u00f3 i la inseguretat de l&#8217;espai, no \u00e9s un projecte flor d&#8217;un dia, ni de cap d\u00e1diva de l&#8217;alcalde anterior, ni de l&#8217;actual. A continuaci\u00f3 mostrem fites temporals per entendre&hellip;<\/p>\n","protected":false},"author":15,"featured_media":36,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/posts\/38"}],"collection":[{"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/comments?post=38"}],"version-history":[{"count":36,"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/posts\/38\/revisions"}],"predecessor-version":[{"id":131,"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/posts\/38\/revisions\/131"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/media\/36"}],"wp:attachment":[{"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/media?parent=38"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/categories?post=38"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/llefia.org\/santsalvador\/wp-json\/wp\/v2\/tags?post=38"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}